
Completed
About this batch
This batch worked on creating a network of stone pathways across the lower farm and planted native shrubs along the eastern boundary. The team laid about 40 metres of path and restored a small seating area that had been overgrown. A satisfying batch — the kind where you can point at something real at the end of each day.
What to expect
- Physical outdoor work — expect to get tired and be satisfied
- Results that stay on the property permanently
- 3 home-cooked meals a day
- Free stay throughout
- Evenings around the bonfire
Skills needed
LandscapingStone laying
Dates
20–24 September 2026
This batch is complete.
See upcoming slotsWe reply within 24 hours